Deadlines, sign-off and issues in steps
The Control tab in the builder sets how much time the assignee has, whom to notify and when, whether manager sign-off is needed, and what to do if a step can't be done.
Deadlines and statuses
- Grace period after the window ends (30 minutes by default) — how long after the window ends the routine can still be done without being late.
- Can be finished late within (12 hours by default) — how long after the grace period the routine can still be completed. A routine finished later counts as done late.
| Status | What it means |
|---|---|
| Pending | the window hasn't started yet or nobody has started |
| In progress | at least one step is marked |
| Awaiting sign-off | the assignee has finished, the manager hasn't accepted it yet |
| Completed | all required steps are marked; can be “late” |
| Overdue | the deadline has passed, but it can still be finished |
| Missed | not a single step was marked by the end of the grace period |
| Not completed | started but not completed by the end of the grace period |
| Cancelled | the manager cancelled the run with a reason, or there was no shift at the location |
A cancelled run counts as neither done nor missed and isn't included in analytics.
Notifications
- When the window opens — a push to assignees: time to do it.
- Remind before deadline (15 minutes by default; 0 — no reminder) — if the routine isn't completed yet.
- Notify the manager about failures — one summary per location: which routines were missed or not completed.
Assignees are location employees with the “Routine execution” permission and the right position; those on shift according to the schedule are notified first. Managers get notifications about failures, about routines awaiting sign-off and about issues in critical steps.
Execution
- Manager sign-off — a completed routine waits until the manager accepts it or returns it with a comment.
- Strictly in order — the next step can't be marked until the previous one is.
- “Not applicable” allowed — for non-critical steps: for example, “water the plants” at a location without plants.
- Camera photos only — the app won't allow picking a photo from the gallery.
When a step is not done or out of range
An issue in a step is:
- a Can’t do it mark with a reason: no supplies, equipment is broken, no access to the area, not enough time, the area is occupied by guests, or a custom reason;
- a measurement out of range;
- an option marked This is an issue is picked;
- the wrong code is scanned, or the timer is stopped early.
What happens next is set in the If a step is not done or out of range block:
- No task, Task for critical ones (default) or Task for any issue;
- Task for — Location manager, Positions at the location (the person on shift first), Employee or Department;
- the Due date in hours and the priority.
The task is created with an “after” photo and confirmation — just like tasks for audit violations. The manager gets a push about an issue in a critical step right away. Working with tasks is covered in Tasks.
To have another routine start right away on an issue (for example, “Supplies restock”), create it with the On issue trigger — see Schedule, chains and conditions.
Sign-off and return
If Manager sign-off is on, a completed routine gets the Awaiting sign-off status and the manager gets a push. In the Day plan, open the run and click:
- Accept — the routine becomes completed;
- Return for rework — enter What to fix (“retake the restroom photo”). The assignee gets a notification with the comment and sees it at the top of the routine in the app.
You need the “Routine control” permission for the location.
Frequently asked questions
An employee missed the window. Is the routine lost?
No. While the “finish late” time is running, the routine can be completed — it will count as done late. It becomes missed or not completed only after that deadline.
Can I just be told about an issue without creating a task?
Yes. Choose No task and mark important steps as Critical — the manager will get a push about the issue, and the run card will show the reason, comment and photo.
The location is closed for a sanitation day. What do I do with routines?
The manager cancels the runs in the Day plan with the Cancel run button and a reason — they won't spoil the statistics. If the company keeps a shift schedule, turn on the Only if there is a shift at the location condition: on days without shifts, runs are cancelled automatically.